Skip to content
CTIcaretrade-internationalTECHNOLOGY · SOURCING · PROJECT DEVELOPMENT
Find anything
EN
Discuss your project
Menu
MODULAR / PROJECT-SPECIFIC

Multi-generator solutions

Several units in a coordinated system concept – subject to technical confirmation.

Enquire about this solution ↗
Illustrative CTI power generation solutionCTICTI POWER SOLUTIONS

Plant concept · configuration agreed for each project.

Solution concept

What we coordinate for your project.

When multiple generators are planned, they need to be considered as a complete system. CTI clarifies the required units and interfaces with you. Parallel operation and load sharing are not automatically confirmed features.

01

Record the number of units and the planned load concept.

02

Obtain confirmation of controls, synchronisation and interfaces.

03

Coordinate switchgear, the protection concept and cabling requirements.

Adding nameplate ratings does not establish confirmed system output or a redundancy design.

Project-specific coordination

Technical coordination scope

Not a universal equipment specification: confirmed data, equipment origin and scope of supply are provided for the specific quoted configuration.

Fuel
To be confirmed for the selected units
Required power
To be confirmed for the specific configuration
Frequency
To be confirmed for the specific configuration
Voltage / network
To be confirmed for the specific configuration
Configuration
Multiple units – configuration on request
Operating mode
Parallel operation only after technical confirmation
Tailored quotation

Let’s discuss your requirements.

Individual quotation on request. Availability must be confirmed for your project.

Enquire about this solution ↗
YOUR DIRECT ROUTE THROUGH CARETRADE

What would you like to find?

Go straight to solutions, people and services.

112 destinations at a glance

Would you like to discuss your project?Enquire about a project
Report emergency requirements