Multi-generator solutions
Several units in a coordinated system concept – subject to technical confirmation.
Enquire about this solution ↗
CTI POWER SOLUTIONSPlant concept · configuration agreed for each project.
What we coordinate for your project.
When multiple generators are planned, they need to be considered as a complete system. CTI clarifies the required units and interfaces with you. Parallel operation and load sharing are not automatically confirmed features.
Record the number of units and the planned load concept.
Obtain confirmation of controls, synchronisation and interfaces.
Coordinate switchgear, the protection concept and cabling requirements.
Adding nameplate ratings does not establish confirmed system output or a redundancy design.
Technical coordination scope
Not a universal equipment specification: confirmed data, equipment origin and scope of supply are provided for the specific quoted configuration.
- Fuel
- To be confirmed for the selected units
- Required power
- To be confirmed for the specific configuration
- Frequency
- To be confirmed for the specific configuration
- Voltage / network
- To be confirmed for the specific configuration
- Configuration
- Multiple units – configuration on request
- Operating mode
- Parallel operation only after technical confirmation
Let’s discuss your requirements.
Individual quotation on request. Availability must be confirmed for your project.



